Lead-in space shall be in accordance with the building code clause. The space shall be lit, heated, with floor drains, threshold in-doors and ventilation.
All meters, meter-frames, main valves, main fuses, supply connection box or main fuse box and main lines ahead (on the utility side) of metering, need to be accessible to our employees.
If you are looking for craftsmen to do work on your premises, we advise you to view homepages of certified plumbers and electricians.
We operate seven utilities for summer house settlements and farmsteads in rural areas. There are no concession activities in these areas. Sparse population and long cable or power line-routes sometimes call for other requirements for connections, services and prices.
These utilities are subject to standard procedures as much as possible, while care should be taken to the economy of the relevant utility and demands that it covers its investments. It is therefore not always possible to connect all in the relevant area, for example, because of technical-, cost or operational reasons. However, this is always evaluated separately.